THE HIGH TOWER AT BARSTOW YARD IN CALIFORNIA
CLICK
HERE TO BUY RUN8 V3 NOW!
Run8
v3 Important Changes
Click here to read the pdf doc
Run8
v3 PC Requirements
Run
8 Train Simulator v3 runs on Windows
7 or newer 64 bit operating systems. 1.7 GB of hard drive
space is needed.
These
are the minimum computer specs that we recommend:
CPU:
2.80 GHz Duel-Core CPU
RAM: 3 Gb RAM
64-bit Windows 7 or newer
(64-bit is a MUST)
GPU: Intel HD4400 graphics chip, or GeForce x40 card with no less than 1 gig of Video Ram. Must support DirectX 11.
|
Included
Routes and Features
*Version 3 is compatiable with version 1 and version 2 content!
*UP-BNSF Mojave Sub
Includes Tehachapi Pass and the Palmdale cutoff betwen Mojave and Hiland
*Barstow-Yermo Yards
Includes working hump at Barstow with retarder brake squeal sounds.
*BNSF Needles Sub
*Includes a cool new shadow system.
*Includes new environmental lighting and weather systems (clouds, rain, snow, thunderstorms, and fog).
*Includes smart AI locomotive engineers that obey signal indications and track speeds.
*Includes a new smart AI Otto dispatching system.
*Includes a new AI Humping system.
*Includes an improved track and switch system (looks mobetta).
*Includes the ability to create a true train simulator world by being able to merge routes with new routes such as the BNSF Cajon Sub, BNSF Seligman Sub, BNSF Bakersfield Sub, BNSF San Bernardino Sub, Lonepine, and Arvin Branches.
*Includes working defect detectors which produce actual random defects to fix.
*Includes accurate signal systems and dispatcher boards for routing player and AI train movements.
*Extensive help documentation.
|
Included
Locomotives
& Rollingstock
*GE
C449W Locomotives Run 8
Liveries
*EMD SD70ACE Locomotives UP/BNSF/CSX
Liveries
*GE
ES44 Locomotives SP/UP/BNSF/CSX/NS
Liveries
*52ft
Well Cars
KLine/JBHunt/Schneider/Evergreen
SeaStar/Maersk/Hyundai/Horizon
China/Hanjim/NFI
*Tank
Cars 105
AGFX/BNSF/CStar/UTLX
*Tank
Cars 107
AGP/BN/BNSF/FRS/GATX Wht-Blk
PROCOR Wht-Blk/ATSF
UTLX Wht-Blk |
Rollingstock cont.
*57ft
Refrigeratior Cars
SFRC/SPFE/UPFE
*C14
3-Bay Cover Hopper Cars
AGP/ASHX/BN/BNSF-S
BNSF-H/CAGX/CARG
CPR/CSX/DME/GATX/UP
POTASH/RUN8/SOY
*50ft
Hi-Cube Box Cars
AOK/BN/BNSF-H/BNSF-S/CAT
CEFX/CN/CNW/CR/CSX/IB/NOKL
RUN8/SP/RTTX/WC
*BNSF
HyRail Track
Inspection Truck
*End
Of Train Device (EOT)
|
CLICK
HERE TO BUY RUN8 V3 NOW!
Run 8 v3 includes both the
UP and BNSF Mojave Subs (220 miles combined), BNSF Barstow yard, UP Yermo yard, and the BNSF Needles Sub (168 miles). All of these routes have been merged and updated with additional track and new scenery. That's a world over 400 miles long (with yards) which includes two freight crew districts and a long pool district!
The UP/BNSF Mojave Sub routes combined are roughly 220 miles
long and includes the world famous "Tehachapi
Pass Loop". Ruling
grades over the pass roughly range between
2.4 and 2.8 percent. The steep mountainous
grades, and countless mountain curves over
the Tehachapi Mountain range and the high
speed running across the Mojave desert into
Barstow present quite a challenge to man
and machine, and the route is still considered
to be one of the most challenging for railroad
crews in North America.
The
Southern Pacific railroad originally built
the line over the Tehachapi Mountains back
in the late 1800s in order to gain access
into Los Angeles and the greater southern
california area. The mainline makes a climb
of nearly 4,000 feet in elevation between
Bakersfield which is at 600 feet, and Summit
Switch located east of the small town of
Tehachapi which is at 4,600 feet. The line
then descends down the eastern side of the
Tehachapi Mountain range, and into the small
high desert community of Mojave. |
A
MEET AT WALONG AKA THE WORLD FAMOUS TEHACHAPI
LOOP |
AMTRAK AT THE STATION IN BAKERSFIELD
THE
RUN8 V3 DISPATCHER SCREEN FOR OPERATIONS ON THE UP AND BNSF MOJAVE SUBS - BNSF DS13 - UP
DS254
A UP TRAIN WAITING AT CALIENTE, CA FOR IT'S TURN TO GO UP THE PASS BEHIND A BNSF AUTORACK TRAIN
CLICK
HERE TO BUY RUN8 V3 NOW!
A
LOCAL WORKING OUT AT MONOLITH NEAR TEHACHAPI |
Our
version of this route was developed to represent
a more modern era of the line, and includes
operations of the Union Pacific, Southern
Pacific (SP merged with the UP in the 90s),
AND BNSF.
Both
BNSF and UP yards in Bakersfield are included
as well as the large BNSF classification
yard in Barstow which has a cool working hump operation, and the UP yard in Yermo
which has a cool transload facility and is located just north of Dagget.
There
is also helper service over this route that
runs on both sides of the Tehachapi pass,
from Mojave to Summit Switch at Tehachapi
on northward trains, and Edison to Summit
Switch on southward trains. Also, the helpers
are usually cut in mid train or put on the
rear of the train so they can shove. Its
also interesting to note that nowadays they
will leave locomotives on the rear of a
train in order to assist with dynamic braking
while descending the hill. These units are
called DPUs and Run8 simulates this operation
very well. |
A COUPLE OF BNSF TRAINS STOP
AT BARSTOW INSPECTION FOR A REFUEL AND CREW CHANGE
THE
RUN8 V3 DISPATCHER SCREEN FOR OPERATIONS AT BARSTOW AND YERMO.
The
route also features working defect detectors, and another
cool operation that Run8 simulates very
well is the humping and kicking of railcars.
And Run8's version of Barstow includes the
large classification bowl and hump that is
fully functional via Run8's hump controller
menu (Left Ctrl+F6) which lets you assign
destination symbols to the various tracks
which can then be matched to the destination
tags of the various railcars that are being
humped.
The hump in v3 can now be worked by AI!
With
a little practice you can be humping railcars
like a pro and it is fun to watch all the
different railcars rolling down into the
bowl. And once a track fills up you can
then go down to the other end of the yard
and run a trim job and start putting new
trains together! It is very cool! |
BNSF
TRIM JOB WORKING IN BARSTOW, CA |
CLICK
HERE TO BUY RUN8 V3 NOW!
THE SOUTHWEST CHIEF #3
MAKING A STOP AT THE STATION IN BARSTOW
THE
RUN8 V3 DISPATCHER SCREEN FOR OPERATIONS ON THE BNSF NEEDLES SUB - BNSF DS12
AMTRAK'S SOUTHWEST CHIEF #3 PULLS INTO NEEDLES, CA
CLICK
HERE TO BUY RUN8 V3 NOW!
Run 8
Support Portal |